Dunshelt

The four communities around Binn Farm have been approached by Green Cat Renewables GCR offering 100% ownership of 2 x 2.35MW turbines located at the Binn Eco Park Wind Farm. Although this is a long term proposition the potential is for these communities to share a profit of £2 million at the end of the 18 year project. Come along to the Public Meeting at Gateside Village Hall on 14th January at 7.30 to find out what is involved. Two sets of slides containing detailed information on the project can be downloaded HERE